ATPI 10 2018
  AIRCRAFT ANALYSIS Bold-Italic are 100% ROI
AIRCRAFT TO BUY LIST 155 Hrs/mo
$6.51 BANK Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Y1 Y2 Y3 Y4 Y5
CESSNA N# TOTAL TIME SMOH ENGINE TBO LOCATION ASSIGN PRICE-ASK BRANDING ENGINES Props Avionics INVESTMENT TBO Replace Dep/hr Fuel Ops $/HR Rate/HR ROI Effective ROI Fair$/hr Income $cost NET
1973 172M 13254 5305 1260 O-320-E2D 2000 IN GNV $54,900.00 $20,000.00 $35,000.00 $16,000.00 $43,000.00 $168,900.00 $35.00 $26.06 $52.08 $27.35 $140.50 $165.00 $24.50 14.85% $165.78 $25,575.00 $21,776.80 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $3,798.20 $45,578.37 $45,578.37 $45,578.37 $45,578.37 $45,578.37
1976 172M 413MA 2614 276 O-320-E2D 2000 FL CRG $88,500.00 $20,000.00 $43,000.00 $151,500.00 $35.00 $23.38 $52.08 $26.41 $136.87 $165.00 $28.13 17.05% $161.51 $25,575.00 $21,214.93 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $4,360.07 $52,320.87 $52,320.87 $52,320.87 $52,320.87 $52,320.87
1979 172N 6694E 5172 1021 O-320H-2AD 2000 FL GNV $89,000.00 $20,000.00 $35,000.00 $43,000.00 $187,000.00 $35.00 $28.86 $52.08 $28.33 $144.27 $165.00 $20.73 12.57% $170.23 $25,575.00 $22,361.28 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $3,213.72 $38,564.62 $38,564.62 $38,564.62 $38,564.62 $38,564.62
        $497.53
COMMANDER 114 Investment $507,400.00 Part 141 $165.00 CESSNA $/HR Part 61 $165.84 $76,725.00 $65,353.01 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $11,371.99 $136,463.86 $136,463.86 $136,463.86 $136,463.86 $136,463.86
$136,463.86 $272,927.72 $409,391.58 $545,855.44 $682,319.30
1978 114 5804N 4249 696 IO-540-TB5 1500 TX CRG $139,500.00 $20,000.00 $43,000.00 $202,500.00 $46.67 $31.25 $104.00 $47.34 $229.25 $270.00 $40.75 15.09% $270.52 $41,850.00 $35,534.40 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $6,315.60 $75,787.25 $75,787.25 $75,787.25 $75,787.25 $75,787.25
Part 141 $230.00   Part 61 $270.00
GRUMMAN Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Y1 Y2 Y3 Y4 Y5
Income $cost NET
1977 AA-5A 9965U 2220 550 O-320-D1A 2000 NC CRG $54,500.00 $20,000.00 $74,500.00 $35.00 $11.50 $52.08 $22.25 $120.83 $145.00 $24.17 16.67% $142.58 $22,475.00 $18,728.47 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $3,746.53 $44,958.37 $44,958.37 $44,958.37 $44,958.37 $44,958.37
1977 AA-5A 26380 3496 1577 O-320-D1A 2000 AL CRG $36,900.00 $20,000.00 $35,000.00 $16,000.00 $107,900.00 $35.00 $16.65 $52.08 $24.06 $127.79 $145.00 $17.21 11.87% $150.79 $22,475.00 $19,807.01 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $32,015.87 $32,015.87 $32,015.87 $32,015.87 $32,015.87
1979 AA-5A 26899 4785 1785 O-320-D1A 2000 CT GNV $42,900.00 $20,000.00 $35,000.00 $16,000.00 $113,900.00 $35.00 $17.58 $52.08 $24.38 $129.04 $145.00 $15.96 11.01% $152.26 $22,475.00 $20,000.76 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $2,474.24 $29,690.87 $29,690.87 $29,690.87 $29,690.87 $29,690.87
1977 AA-5B 289HF 5340 360 O360-A4K 2000 MI GNV $69,000.00 $20,000.00 $89,000.00 $35.00 $13.73 $52.08 $23.04 $123.85 $145.00 $21.15 14.59% $146.14 $22,475.00 $19,196.70 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $3,278.30 $39,339.62 $39,339.62 $39,339.62 $39,339.62 $39,339.62
1979 AA-5B 4535D 1890 600 O360-A4K 2000 NC GNV $49,000.00 $20,000.00 $69,000.00 $35.00 $10.65 $52.08 $21.95 $119.68 $145.00 $25.32 17.46% $141.23 $22,475.00 $18,550.87 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $3,924.14 $47,089.62 $47,089.62 $47,089.62 $47,089.62 $47,089.62
Investment $454,300.00 $70.11 Part 141 $145.00 GRUMMAN$/hr Part 61 $146.60 $112,375.00 $96,283.80 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $16,091.20 $193,094.35 $193,094.35 $193,094.35 $193,094.35 $193,094.35
$193,094.35 $386,188.70 $579,283.05 $772,377.40 $965,471.75
COUGAR
1978 GA-7 384MA 3259 257/44 0-320-D1Dx2 2000 FL CRG $190,000.00 $20,000.00 $210,000.00 $35.00 $32.41 $104.00 $47.74 $219.15 $290.00 $70.85 24.43% $258.60 $44,950.00 $33,968.25 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $10,981.75 $131,781.00 $131,781.00 $131,781.00 $131,781.00 $131,781.00
1978 GA-7 N78HS 5570 1080 0-320-D1Dx2 2000 MS GNV $165,000.00 $20,000.00 $70,000.00 $255,000.00 $35.00 $39.35 $104.00 $50.17 $228.53 $290.00 $61.48 21.20% $269.66 $44,950.00 $35,421.38 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $9,528.63 $114,343.50 $114,343.50 $114,343.50 $114,343.50 $114,343.50
Investment $465,000.00 Part 141 $290.00 COUGAR$/hr Part 61 $264.13 $89,900.00 $69,389.63 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $20,510.38 $246,124.50 $246,124.50 $246,124.50 $246,124.50 $246,124.50
$246,124.50 $492,249.00 $738,373.50 $984,498.00 $1,230,622.50
MUDRY CAP -10 N140JA 5097 10 1200 CA CRG $60,000.00 $20,000.00 $80,000.00 $58.33 $12.35 $52.08 $22.55 $145.31 $225.00 $79.69 35.42% $171.46 $15,525.00 $10,026.25 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $5,498.75 $65,984.98 $65,984.98 $65,984.98 $65,984.98 $65,984.98
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Y1 Y2 Y3 Y4 Y5
Piper TWINS Income $cost NET
1979 PA-34-200T N102LL 5360 260/1988 TSIO-3600 2000 AZ CRG $116,500.00 $20,000.00 $35,000.00 $171,500.00 $35.00 $26.47 $13.00 $13.81 $88.28 $220.00 $131.72 59.87% $104.17 $34,100.00 $13,683.27 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $20,416.73 $245,000.75 $245,000.75 $245,000.75 $245,000.75 $245,000.75
1979 PA-34-200T N2952L 4084 972/972 TSIO-3600 2000 VA GNV $119,000.00 $20,000.00 $139,000.00 $35.00 $21.45 $13.00 $12.06 $81.51 $220.00 $138.49 62.95% $96.18 $34,100.00 $12,633.79 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $21,466.21 $257,594.50 $257,594.50 $257,594.50 $257,594.50 $257,594.50
Investment $310,500.00 $68,200.00 $26,317.06 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $41,882.94 $502,595.25 $502,595.25 $502,595.25 $502,595.25 $502,595.25
$502,595.25 $1,005,190.50 $1,507,785.75 $2,010,381.00 $2,512,976.25
ARROW SINGLE ENGINE RETRACT
1973 PA-28R-200 56326 3082 406 IO-360-CIC 2000 TX CRG $75,000.00 $20,000.00 $95,000.00 $35.00 $14.66 $52.08 $23.36 $125.10 $145.00 $19.90 13.72% $147.62 $22,475.00 $19,390.45 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $3,084.55 $37,014.62 $37,014.62 $37,014.62 $37,014.62 $37,014.62
1973 PA-28R-200 55599 6396 1040 IO-360-CIC 2000 MA CRG $59,900.00 $20,000.00 $35,000.00 $114,900.00 $35.00 $17.73 $52.08 $24.43 $129.25 $145.00 $15.75 10.87% $152.51 $22,475.00 $20,033.05 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $2,441.95 $29,303.37 $29,303.37 $29,303.37 $29,303.37 $29,303.37
1974 PA-28R-200 32PD 4475 238 IO-360-CIC 2000 CA GNV $54,900.00 $20,000.00 $74,900.00 $35.00 $11.56 $52.08 $22.27 $120.91 $145.00 $24.09 16.61% $142.68 $22,475.00 $18,741.39 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $3,733.61 $44,803.37 $44,803.37 $44,803.37 $44,803.37 $44,803.37
1976 PA-28R-200 200KR 9750 357 IO-360-CIC 2000 CA GNV $69,900.00 $20,000.00 $89,900.00 $35.00 $13.87 $52.08 $23.08 $124.04 $145.00 $20.96 14.46% $146.36 $22,475.00 $19,225.76 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $3,249.24 $38,990.87 $38,990.87 $38,990.87 $38,990.87 $38,990.87
Investment $374,700.00 Part 141 $145.00 ARROW $/hr Part 61 $147.29 $89,900.00 $77,390.65 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $12,509.35 $150,112.23 $150,112.23 $150,112.23 $150,112.23 $150,112.23
$150,112.23 $300,224.46 $450,336.69 $600,448.92 $750,561.15
WARRIOR FIXED GEAR TRAINER
1974 PA-28-151 C-GNBQ 1095 1061 O-320-E3D 2000 AB CAN GNV $45,000.00 $20,000.00 $35,000.00 $100,000.00 $35.00 $15.43 $52.08 $23.63 $126.14 $145.00 $18.86 13.01% $148.85 $22,475.00 $19,551.91 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $2,923.09 $35,077.12 $35,077.12 $35,077.12 $35,077.12 $35,077.12
1974 PA-28-151 44668 5590 20 O-320-E3D 2000 PA GNV $39,900.00 $20,000.00 $59,900.00 $35.00 $9.24 $52.08 $21.46 $117.79 $135.00 $17.21 12.75% $138.99 $20,925.00 $18,257.01 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $32,015.87 $32,015.87 $32,015.87 $32,015.87 $32,015.87
1975 PA-28-151 33404 3900 0 O-320-E3D 2000 ME GNV $52,000.00 $20,000.00 $72,000.00 $35.00 $11.11 $52.08 $22.12 $120.31 $135.00 $14.69 10.88% $141.96 $20,925.00 $18,647.74 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $2,277.26 $27,327.12 $27,327.12 $27,327.12 $27,327.12 $27,327.12
1978 PA-28-151 542MA 7343 1361 O-320-D3G 2000 FL CRG $47,000.00 $20,000.00 $35,000.00 $16,000.00 $118,000.00 $35.00 $18.21 $52.08 $24.60 $129.89 $145.00 $15.11 10.42% $153.27 $22,475.00 $20,133.16 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $2,341.84 $28,102.12 $28,102.12 $28,102.12 $28,102.12 $28,102.12
1978 PA-28-161 36488 4419 20 O-320-D3G 2000 CA CRG $55,000.00 $20,000.00 $75,000.00 $35.00 $11.57 $52.08 $22.28 $120.93 $135.00 $14.07 10.42% $142.70 $20,925.00 $18,744.62 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $2,180.39 $26,164.62 $26,164.62 $26,164.62 $26,164.62 $26,164.62
1979 PA-28-161 2227Z 5755 989 O-320-D3G 2000 IN CRG $39,900.00 $20,000.00 $59,900.00 $35.00 $9.24 $52.08 $21.46 $117.79 $135.00 $17.21 12.75% $138.99 $20,925.00 $18,257.01 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $2,667.99 $32,015.87 $32,015.87 $32,015.87 $32,015.87 $32,015.87
Investment $484,800.00 Part 141 $135.00 WARRIOR $/hr Part 61 $144.13 $128,650.00 $113,591.44 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $15,058.56 $180,702.72 $180,702.72 $180,702.72 $180,702.72 $180,702.72
$180,702.72 $361,405.44 $542,108.16 $722,810.88 $903,513.60
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Y1 Y2 Y3 Y4 Y5
SOCATA H/P SINGLE RETRACT Income $cost NET
1984 TB-20 24TA 1940 210 IO-540-C4D5D 1500 LA GNV $117,000.00 $20,000.00 $137,000.00 $46.67 $21.14 $104.00 $43.80 $215.61 $245.00 $29.39 12.00% $254.42 $37,975.00 $33,419.29 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $4,555.71 $54,668.50 $54,668.50 $54,668.50 $54,668.50 $54,668.50
2003 TB-20 214GT 955 995 IO-540-C4D5D 1500 KY CRG $125,000.00 $20,000.00 $145,000.00 $46.67 $22.38 $104.00 $44.23 $217.28 $245.00 $27.73 11.32% $256.38 $37,975.00 $33,677.63 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $4,297.38 $51,568.50 $51,568.50 $51,568.50 $51,568.50 $51,568.50
  Investment $282,000.00 Part 141 $245.00 SOCATA $/hr Part 61 $0.00 $75,950.00 $67,096.92 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $8,853.08 $106,237.00 $106,237.00 $106,237.00 $106,237.00 $106,237.00
  $106,237.00 $212,474.00 $318,711.00 $424,948.00 $531,185.00
 
 
GENERAL FLT SCHOOL TOTALS                                 $2,878,700.00                     $661,100.00 $527,563.86 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $133,536.14 $1,602,433.64 $1,602,433.64 $1,602,433.64 $1,602,433.64 $1,602,433.64
TURBOPROPS                                                       Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Y1 Y2 Y3 Y4 Y5
CESSNA N# TOTAL TIME SMOH ENGINE TBO LOCATION ASSIGN PRICE-ASK BRANDING ENGINES Props Avionics INVESTMENT TBO Replace Dep/hr Fuel Ops $/HR Rate/HR ROI Effective ROI Fair$/hr Income $cost NET
1981 KING AIR F90 173PL 10250 200 200 1500 TX CRG $520,000.00 $20,000.00 $540,000.00 $46.67 $83.33 $368.00 $157.97 $655.97 $775.00 $119.03 15.36% $774.04 $120,125.00 $101,674.83 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $18,450.17 $221,402.00 $221,402.00 $221,402.00 $221,402.00 $221,402.00
1983 COMMANDER 840 835CC 7800 992 992 5000 MT CRG $749,000.00 $20,000.00 $769,000.00 $14.00 $118.67 $368.00 $170.34 $671.01 $800.00 $128.99 16.12% $791.79 $124,000.00 $104,006.29 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $19,993.71 $239,924.50 $239,924.50 $239,924.50 $239,924.50 $239,924.50
1981 COMMANDER 840 840PN 7696 2263 2263 5000 IL GNV $790,000.00 $20,000.00 $810,000.00 $14.00 $125.00 $368.00 $172.55 $679.55 $800.00 $120.45 15.06% $801.87 $124,000.00 $105,330.25 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $18,669.75 $224,037.00 $224,037.00 $224,037.00 $224,037.00 $224,037.00
1976 COMMANDER 690A 690AG 5555 1993 1993 5000 IL GNV $695,000.00 $20,000.00 $715,000.00 $14.00 $110.34 $368.00 $167.42 $659.76 $775.00 $115.24 14.87% $778.51 $120,125.00 $102,262.54 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $17,862.46 $214,349.50 $214,349.50 $214,349.50 $214,349.50 $214,349.50
Investment $2,834,000.00   Part 141 $775.00 Part 61 $800.00 $488,250.00 $413,273.92 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $74,976.08 $899,713.00 $899,713.00 $899,713.00 $899,713.00 $899,713.00
$899,713.00 $1,799,426.00 $2,699,139.00 $3,598,852.00 $4,498,565.00
VLJ                                                                                            
2009 Phenom 100 661EP 2242 2242 ESPGOLD 2242 N/A CA CRG $2,000,000.00 $20,000.00 $2,020,000.00 $311.73 $368.00 $237.90 $1,516.00 $2,500.00 $984.00 39.36% $1,788.88 $387,500.00 $234,980.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $152,520.00 $1,830,240.00 $1,830,240.00 $1,830,240.00 $1,830,240.00 $1,830,240.00
$4.00 students Part 141 $625.00 Part 61 $625.00 $1,830,240.00 $3,660,480.00 $5,490,720.00 $7,320,960.00 $9,151,200.00
PAINT/INTERIOR/LIGHTS
AIRCRAFT PAINT ORMOND BEACH 10,000/EA  WHITE PLAIN  $10,000.00
VINYL STRIPING JAX AGGRESSIVE 2000/EA PER OUR DESIGN $2,000.00
NEW INTERIOR PLASTICS     PLANE PLASTICS 2885/PER PLANE ALL INTERIOR $2,885.00
AEROLEADS 50,000 HR LIFE ALL 3250/PER PLANE PLUS INSTALL * $3,250.00
AVIONICS 43000/EA
PACKAGE INCLUDES
GMA 340 AUDIO PANEL
GTX345 TXPD W ADSB I/O
GTN650 GPS/NAV/COM
GNC255A GPS NAV COM
G-5 EFIS
G-5 EFIS
GAE ATLT ENCODER
GI-106B CDI GPOS/VOR/LOC
GA 35  ANTENNA
GA-56 ANTENNA
PANEL         RETAIL $47,000.00
SUGGEST BUILD IN HOUSE BUY CUTTER AND FLAT STOCK, POWDER COAT W SILK SCREEN $1,000.00
ENGINES
RECOMMEND HAS OUR SHOP REBUILD IN HOUSE FOR PARTS/LABOR  10000/EA
PURCHASE FACTORU REMAN OR REBUILD IN SHOP FROM USED CORES
PRICE DEPENDS ON MODEL ENGINE AND VENDOR
AIRCRAFT ENGINE WORKS LOCALLY CHARGES $12-15 FOR 4 CYL/ $18-25 6 CYL FOR REBUILD
MISC
DOES NOT INCLUDE TRAVEL, PRE BUY INSPECTIONS,FERRY BACK TO JAX
DEPENDEDT ON LOCATION, INSEPCTION PRICE,WEATHER